NAM TAN UYEN EXPANSION INDUSTRIAL PARK
Province
Binh Duong
Occupancy Rate
5%
Area
346 hectares
Lease Price
30 USD/m2
Details
Industrial Park Name | Nam Tan Uyen Industrial Park Expansion (Phase II) |
Location | Uyen Hung Ward and Hoi Nghia Ward, Tan Uyen Town, Binh Duong Province |
Total Area | 346 hectares |
Land Rental Price | 30 USD/m2 |
Construction Density | 60% |
Occupancy Rate | 5% |
Infrastructure Information
Electrical System | Power supply capacity: 2×63 MVA, voltage: 110/22kV |
Water System | |
Sewage System | |
Traffic System | The internal road is 42m wide. |
1. Project overview and legal information
The Nam Tan Uyen Industrial Park was approved by the Binh Duong Provincial People’s Committee in 2005 with a scale of over 331 hectares. To date, this industrial park, along with the expansion of Phase I, has achieved a near-total occupancy rate. Due to development needs, the Nam Tan Uyen Industrial Park Expansion Project Phase II (NTC 3) received investment approval from the Prime Minister under Decision No. 1157/QD-TTg dated September 13, 2018.
By August 2020, Binh Duong province had reclaimed nearly 346 hectares of rubber plantation land in Uyen Hung ward and Hoi Nghia commune (Tan Uyen town) to implement the project. Phase II has a total area of 345.86 hectares with a total investment of approximately VND 1,485 billion, of which 20% is equity capital, 40% is bank loans, and 40% is from other sources. The land use structure includes over 254 hectares for factories and warehouses, approximately 7.5 hectares for technical infrastructure, over 3.4 hectares for administrative and service areas, over 36 hectares for green space, and the remainder for transportation systems.
The expansion area is being developed on land belonging to the Hoi Nghia Rubber Plantation, located in Uyen Hung and Hoi Nghia wards, Tan Uyen City, with a land lease term until September 13, 2068.
Overview of Nam Tan Uyen Industrial Park Expansion (Phase II):
- Project Name: Nam Tan Uyen Industrial Park Expansion (Phase II)
- Location: Uyen Hung and Hoi Nghia wards, Tan Uyen City. Tan Uyen, Binh Duong Province
- Area: 345.86 hectares
- Operating period: 50 years (2018 – 2068)
- Occupancy rate: Approximately 5%
- Investment sectors: Mechanical engineering; food and beverage processing; building materials manufacturing; pharmaceuticals and cosmetics; textiles (excluding dyeing)
Together with the existing Nam Tan Uyen Industrial Park, the expansion area is contributing to the development of industry and services in the region. This development not only creates many job opportunities for workers but also attracts a large number of foreign experts to live and work, thereby contributing positively to the economic growth of Tan Uyen City in particular and Binh Duong Province in general, while also preparing to welcome the wave of FDI investment shifting to Vietnam.
2. Costs and incentives in the expanded Nam Tan Uyen Industrial Park (Phase II)
- Management fee: approximately $0.6 USD/m² per year
- Electricity price: ranges from $0.05 USD (normal hours) to $0.1 USD (peak hours)
- Clean water price: approximately $0.4 USD/m³
- Wastewater treatment fee: approximately $0.28 USD/m³
Businesses investing in the expanded Nam Tan Uyen Industrial Park are entitled to many preferential policies as stipulated by current State regulations, specifically:
- Corporate Income Tax (CIT): Exempt for the first two years and a 50% reduction in tax payable for the following four years.
- Import Tax: Completely exempt from import tax on goods imported for the project such as machinery, equipment, transportation vehicles, and construction materials.
3. Geographical location of the expanded Nam Tan Uyen Industrial Park (Phase II)
The expanded Nam Tan Uyen Industrial Park is located on a major transportation axis including the DT 746 and DT 747B routes, with a 38m wide cross-section and 6 lanes, facilitating convenient connections to major cities and economic centers in the region.
Distance to key areas:
- Ho Chi Minh City: approximately 33 km (equivalent to 55 minutes of travel)
- Binh Duong New City: approximately 8 km (15 minutes)
- Dong Nai Province Center: approximately 22 km (30 minutes)
- Tan Son Nhat International Airport: approximately 34 km (45 minutes)
- Long Thanh International Airport: approximately 55 km
- Saigon Railway Station: approximately 35 km
- Saigon Port: approximately 36 km
- Song Than ICD Port: approximately 18 km (15 minutes)
- Cat Lai Port: approximately 32 km (55 minutes)
- Thanh Phuoc River Port: approximately 8 km (15 minutes)
4. Infrastructure System
As of March 2023, the Nam Tan Uyen Industrial Park Expansion – Phase II has completed initial work such as consulting, surveying, design, and compensation and land clearance; and is awaiting approval from the Provincial People’s Committee for land allocation procedures.
As one of the newer industrial parks in Binh Duong, the project is currently focusing on accelerating investment progress and completing technical infrastructure.
- Internal transportation: The internal road system is planned with a width of 42m, ensuring smooth traffic flow.
- Electricity system: The power supply has a capacity of 2×63 MVA, with a voltage of 110/22kV, and is routed to the boundary of each land plot.
Other infrastructure items such as clean water supply, wastewater treatment, telecommunications, and fire protection are being actively constructed and gradually completed to soon meet the operational needs of investors.