LONG HAU INDUSTRIAL PARK

Province

Long An

Occupancy Rate

90%

Area

425 hectares

Lease Price

Contact

Details

Industrial Park Name

Long Hau Industrial Park

Location

Long Hau Commune, Can Giuoc District, Long An Province

Total Area

425 hectares

 Occupancy Rate

90%

Infrastructure Information

Electrical System

110/22kV – 37 MWA Hoa Lien Substation. A double-circuit 110kV line supplies power to the substation, connecting it to the Hoa Khanh – Hai Van Tunnel 110kV line.

Water System

– Long Hau groundwater treatment plant, capacity 10,000 m³/day – Ho Chi Minh City water supply system, capacity 15,000 m³/day. Water quality: according to Vietnamese standards (TCXD 33:2006)

Sewage System

The quality of treated water meets the National Technical Standard on Industrial Wastewater – QCVN40:2011/BTNMT 5000 m³/day 4500 m³/day

Traffic System

Connecting to Ho Chi Minh City via the Nguyen Huu Tho (North-South) road axis, a 10-lane highway.

1. Project overview and legal information

Long Hau Industrial Park was established by Decision No. 1107/QD-TTg dated August 21, 2006, of the Prime Minister, and was granted Investment Certificate No. 50221000001 by the Long An Provincial Economic Zone Management Board (LAEZA) on May 3, 2007.

Below is an overview of Long Hau Industrial Park:

  • Project Name: Long Hau Industrial Park
  • Location: Long Hau Commune, Can Giuoc District, Long An Province
  • Scale: 425 hectares
  • Operating Period: 50 years (2006 – 2056)
  • Occupancy Rate: Approximately 90%
    Investment Attracting Industries: Including food and seafood processing; supporting industries; warehousing and logistics services; high-tech industries, research & development (R&D); mechanical engineering, precision mechanics, machinery and equipment assembly; Manufacturing of building materials (excluding cement and metallurgy); processing of certain low-toxicity chemicals; manufacturing of wood, bamboo, and rattan products; printing of packaging (excluding ink production) and consumer goods.

2. Investment costs and incentives

  • Land lease price: Please contact for details

  • Infrastructure management fee: US$0.42/m²/year

  • Electricity cost: Businesses contract directly with the Electricity Corporation (EVN) in Can Giuoc District, Long An Province

  • Clean water price: VND 9,020/m³

  • Wastewater treatment fee: VND 6,942/m³ (accepts Class C wastewater input, treats to Class A output standards)

  • Solid waste treatment fee: Businesses contract directly with waste collection and treatment units according to regulations

Regarding corporate income tax policy, businesses operating in Long Hau Industrial Park will be exempt from tax for the first two years, and then receive a 50% reduction in tax payable for the following four years.

Regarding import duties, value-added tax (VAT), and other incentives, businesses will apply according to current Vietnamese law.

In addition, the investor of Long Hau Industrial Park always accompanies and supports investors in completing legal procedures quickly, with a professional team and close coordination from the functional agencies of Long An province.

3. Geographical location of Long Hau Industrial Park

Long Hau Industrial Park is located in an area designated for industrial development under Ho Chi Minh City’s “East Sea orientation” strategy. Thanks to its advantageous geographical location and integrated transportation system, investment here is considered a suitable choice for businesses needing to build factories near Ho Chi Minh City and neighboring provinces such as Long An.

Regional Connectivity:

  • To the North, it borders Ho Chi Minh City via the North-South transportation axis (Nguyen Huu Tho Road).
  • To the East, it is adjacent to major ports such as SPCT Port, Saigon – Hiep Phuoc Port, and Tan Cang Hiep Phuoc Port via the Long Hau – Hiep Phuoc road.

Distance to key hubs:

  • Approximately 3 km from Saigon Central Container Port (SPCT) and Saigon – Hiep Phuoc Port.
  • Approximately 5 km from Ben Luc – Long Thanh Expressway.
  • Approximately 12 km from Phu My Hung urban area.
  • Distance from the city center… Ho Chi Minh City: approximately 19 km
  • Distance from Tan Son Nhat International Airport: approximately 25 km
  • Distance from Long Thanh International Airport: approximately 35 km
  • Distance from Cat Lai Port: approximately 25 km
  • Distance from Saigon High-Tech Park: approximately 30 km

Natural conditions:
The area has an alluvial plain topography, gradually sloping from west to east. The groundwater level is at a depth of approximately 200m below the surface. The climate is tropical monsoon near the equator, with stable temperatures year-round, averaging around 27.5°C, with two distinct rainy and dry seasons.

4. Infrastructure System

Long Hau Industrial Park has now completed its entire technical and social infrastructure system. Not only does it possess a comprehensive infrastructure, but the industrial park also provides a variety of professional services such as recruitment and training support, healthcare clinics, worker accommodation, and many other amenities, contributing to a stable production environment and favorable living conditions.

Technical Infrastructure:

  • Internal Transportation: Directly connected to Ho Chi Minh City via the Nguyen Huu Tho (North-South) road with 10 lanes. The transportation system is flexibly linked to other areas via routes such as National Highway 1A, the Long Hau – Tan Tap – National Highway 50 route to the Western provinces; Phu My Bridge to the Eastern provinces; Ho Chi Minh City Ring Road 4 and the Ben Luc – Long Thanh Expressway. Internal roads are approximately 20m wide (including sidewalks), with a 12m road width and 4 lanes.
  • Electrical system: Powered from the 110/22kV – 37 MVA Hoa Lien substation, connected via a double-circuit 110kV line, ensuring a stable and continuous power supply for production activities.
  • Clean water supply system: Simultaneously utilizes two sources: an underground water treatment plant within the industrial park (capacity 10,000 m³/day) and a water supply system from Ho Chi Minh City (capacity 15,000 m³/day), meeting Vietnamese water quality standards (TCXD 33:2006).
  • Wastewater treatment system: Wastewater is treated centrally to meet national standards QCVN 40:2011/BTNMT, with a total capacity of approximately 5,000 m³/day.

Wastewater treatment plant in Long Hau Industrial Park

  • Telecommunications System: A comprehensive investment has been made through cooperation with the telecommunications unit in the eastern part of Ho Chi Minh City (number 028). The infrastructure includes copper and fiber optic cables, providing modern services such as leased lines, ADSL, high-speed internet… ensuring stable and cost-effective communication connections.

Supporting Amenities:
The industrial park is also fully equipped with amenities such as a fire station, customs office, police station, 24/7 security force, accommodation for workers and experts, medical clinic, mini-supermarket, kindergarten… comprehensively meeting the working and living needs of businesses and workers.