DONG XUYEN INDUSTRIAL PARK

Province

Ba Ria Vung Tau

Occupancy Rate

100%

Area

160.81 hectares

Lease Price

85 USD/m2

Details

Industrial Park Name

Dong Xuyen Industrial Park

Location

Rach Dua Ward, Vung Tau City, Ba Ria – Vung Tau Province

Total Area

160.81 hectares

Land Rental Price

85 USD/m2

Construction Density

60%

 Occupancy Rate

100%

Infrastructure Information

Electrical System

110kV/22kV

Water System

35,000 m3/day

Sewage System

3,000 m3/day

Traffic System

The internal roads within the industrial park, with a total length of 9.22 km, were constructed to adequately accommodate specialized transport vehicles such as container trucks.

1. Project overview and legal information

The Dong Xuyen Industrial Park (Ba Ria – Vung Tau province) was established by Decision No. 639/QD-TTg dated September 9, 1996, of the Prime Minister and its detailed planning was approved by the Ministry of Construction in Decision No. 567/BXD-KTQH dated October 30, 1996. The project has a total planned area of ​​160.81 hectares, located in Rach Dua ward, Vung Tau city, with an operating term of 50 years from October 30, 1996 (according to Decision No. 804/QD-TTg). Of this, the area of ​​industrial land available for lease is 128.84 hectares.

2. Investment costs

When leasing land in Dong Xuyen Industrial Park, investors need to pay the following basic costs:

Infrastructure usage fee: approximately 85 USD/m² for the entire lease period
Industrial park management fee: applied according to the current regulations of the People’s Committee of Ba Ria – Vung Tau province

Wastewater treatment fee:

  • 4,400 VND/m³ for wastewater meeting standard B before treatment
  • 9,800 VND/m³ for wastewater exceeding standard B (including VAT)

Clean water price: approximately 12,500 VND/m³

Electricity price: calculated according to the price list of Vung Tau City Power Company

Note: The above prices do not include VAT (except for the wastewater treatment fee which includes VAT).

Currently, Dong Xuyen Industrial Park has leased all its industrial land, achieving a 100% occupancy rate.

3. Geographical location

Dong Xuyen Industrial Park boasts a favorable location in terms of transportation and port connectivity, specifically:

  • Approximately 7 km from the center of Vung Tau City
  • Approximately 125 km from Ho Chi Minh City
  • Approximately 80 km from Long Thanh International Airport
  • Approximately 87 km from Bien Hoa Railway Station
  • Directly bordering the sea

Thanks to its advantage of having three sides bordering the sea, the industrial park is oriented towards developing in the following areas: oil and gas industrial services (port exploitation, storage, distribution, and transportation of oil and gas); maritime services (warehousing, seaports, and shipping); and general industries such as mechanical engineering, electronics manufacturing, and consumer goods.

4. Infrastructure system

  • Internal Transportation System:
    The internal road network within the industrial park has a total length of approximately 9.22 km, designed to meet the traffic needs of specialized transport vehicles, including container trucks.
  • Electricity Supply System:
    Electricity for production is supplied from a 110kV/22kV transformer station located within the industrial park, combined with a 22kV power line already extended to the fence of each factory.
  • Water Supply System:
    Clean water is supplied from the water treatment plant of Vung Tau Water Supply Joint Stock Company, with a capacity of up to 35,000 m³/day, fully meeting production needs.
  • Wastewater Treatment System:
    The industrial park is equipped with a centralized wastewater treatment plant meeting standard B, with a treatment capacity of approximately 3,000 m³/day.
  • Communication System:
    The telecommunications and fiber optic infrastructure is fully installed, connecting directly to each factory, ensuring smooth communication.