TRA KHA INDUSTRIAL PARK

Province

Bac Lieu

Occupancy Rate

97%

Area

63.87 hectares

Lease Price

65 USD/m2

Details

Industrial Park Name

Tra Kha Industrial Park

Location

Ward 8, Bac Lieu town, Bac Lieu province

Total Area

63.87 hectares

Land Rental Price

65 USD/m2

Construction Density

60%

 Occupancy Rate

97%

Infrastructure Information

Electrical System

22kV

Water System

 

Sewage System

2000 m3/day

Traffic System

 

1. Project overview and legal information

The Tra Kha Industrial Park was included in the Vietnamese industrial park development plan by the Prime Minister’s Decision No. 1107/QD-TTg dated August 21, 2006, with an initial planned size of 66 hectares. On November 3, 2006, the project received further approval for establishment under Official Letter No. 1782/TTg-CN, with the adjusted area reduced to 63.9 hectares, including over 43 hectares of industrial land.

During implementation, due to issues related to a portion of the land belonging to the national defense sector, the industrial park was actually only built on approximately 60 hectares. According to the Bac Lieu Provincial Planning for the period 2021–2030, this area was officially adjusted down to 60 hectares to reflect the actual situation.

On April 18, 2007, the People’s Committee of Bac Lieu province approved the detailed construction plan at a scale of 1/2000 for the project according to Decision No. 122/QD-UBND. The industrial park is located in Ward 8, Bac Lieu town (now Bac Lieu city), adjacent to two important transportation routes: National Highway 1A and the 23/8 road – a direct connection to the city center.

The project is invested by Bac Lieu Industrial Park Infrastructure Development Company (under the Management Board of Bac Lieu Industrial Parks), with a total investment of over 285 billion VND, and construction began in 2010.

Tra Kha Industrial Park is oriented to attract industries such as textiles, beer and spirits production, building materials, packaging, fertilizers, and other clean industries.

2. Costs and incentives for leasing land in Tra Kha Industrial Park

Businesses investing in Tra Kha Industrial Park enjoy many preferential policies, notably:

  • 100% exemption from corporate income tax for the first two years
  • 50% reduction in corporate income tax for the following four years;
  • Exemption from import tax on machinery and equipment on the preferential list used to create fixed assets.

Currently, Tra Kha Industrial Park is operating stably with an occupancy rate of over 97%, attracting approximately 25 investment projects in fields such as textiles, electrical industry, beer and wine production, fertilizers, packaging, and construction materials.

Some typical projects operating here include: Vinatex Garment Factory; Minh Tri Packaging Factory; SIBA High-Tech Mechanical Factory; Saigon Beer – Bac Lieu Factory (SABECO)… contributing to the promotion of local industrial and economic development.

3. Geographical location of Tra Kha Industrial Park

Regional connectivity:

  • Distance from Bac Lieu City center: approximately 5 km
  • Distance from Can Tho City: approximately 105 km
  • Distance from Ca Mau Airport: approximately 60 km
  • Distance from Can Tho International Airport: approximately 115 km

4. Infrastructure System

The Tra Kha Industrial Park boasts a relatively comprehensive infrastructure system, meeting the production needs of businesses:

  • Electricity supply: Power is supplied from the national grid via a 22kV power line system, directly connected to each plot of land.
  • Water supply: Water is supplied by Bac Lieu Water Supply Joint Stock Company, with a pipeline network arranged along the internal transportation routes.
  • Wastewater treatment: A centralized wastewater treatment system with a planned capacity of approximately 2,000 m³/day.
  • Drainage: A rainwater drainage system integrated with the wastewater drainage system.
  • Other amenities: Including internal transportation, communication, fire protection, green spaces, and public lighting.