MY PHUOC 3 INDUSTRIAL PARK

Province

Binh Duong

Occupancy Rate

90%

Area

997.71 hectares

Lease Price

Contact

Khu Công nghiệp Mỹ Phước 3 được thành lập theo Quyết định số 1316/TTg-CN do Thủ tướng Chính phủ ban hành ngày 28/8/2006. Sau đó, quy hoạch chi tiết của khu công nghiệp tiếp tục được phê duyệt theo Quyết định số 1308/QĐ-BXD ngày 18/9/2006 bởi Bộ Xây dựng.

Cổng chính Khu Công nghiệp Mỹ Phước 3

Details

Industrial Park Name

My Phuoc 3 Industrial Park

Location

Thoi Hoa Ward and My Phuoc Town, Ben Cat City, Binh Duong Province

Total Area

997.71 hectares

 Occupancy Rate

90%

Infrastructure Information

Electrical System

Substation capacity: 126 MVA (phase 1), 200 MVA (phase 2) & 500 MVA (phase 3)

Water system

Capacity of 12,000 m3/day (Phase I), expanding to 30,000 m3/day (Phase II) and 120,000 m3/day (Phase III).

Sewage System

16,000 m3/day

Traffic System

Internal road is 25m wide

1. Project overview and legal information

With a total investment of approximately VND 1,219 billion, My Phuoc 3 Industrial Park is developed on an area of ​​997.71 hectares, of which 655.69 hectares are allocated for industrial production. The industrial park officially commenced operations in 2007 and is one of the pioneering projects in Vietnam to apply the mixed-use industrial park model. Accordingly, it focuses not only on manufacturing but also integrates service, commercial, urban, and residential functions, contributing to sustainable development and shaping the formation of an industrial city in the northern part of Binh Duong province.

Overview of My Phuoc 3 Industrial Park:

  • Name: My Phuoc 3 Industrial Park
  • Location: Thoi Hoa Ward and My Phuoc Town, Ben Cat City, Binh Duong Province
  • Scale: 997.71 hectares
  • Operating period: 50 years (2006 – 2056)
  • Occupancy rate: Approximately 90%

Investment sectors:

The industrial park targets diverse manufacturing industries such as electrical and electronics, information technology and telecommunications, mechanical and precision mechanics, automobile and motorcycle manufacturing and components, textiles, leather and footwear (excluding fresh leather), plastics, ceramics, glass, food processing and agricultural and forestry products, pharmaceutical and cosmetic production, technical rubber industry, industrial gases, wood and furniture production, building materials, construction steel and steel pipes, sports equipment, toys and jewelry production, packaging, printing and paper (excluding pulp production), and more. such as optical and medical devices.

External transportation system of My Phuoc 3 Industrial Park

The project has a total planned area of ​​190.76 hectares and officially commenced operations in 1999. To date, the industrial park has leased 133.10/133.67 hectares of industrial land, achieving an occupancy rate of approximately 99.57%. The industrial park has attracted 70 domestic and foreign investors, with Taiwanese businesses accounting for the largest proportion (45%), followed by South Korea (18%), Vietnam (28%), along with investors from Japan, Hong Kong, Thailand, China, etc.

Businesses here operate in various fields such as textiles, yarn spinning, garment manufacturing, mechanical engineering, packaging production, household goods, rubber products, etc., and most have achieved positive business results. The success of these investors has significantly contributed to the economic restructuring process of Tay Ninh province towards industrialization and modernization.

2. Costs and investment incentives of My Phuoc 3 Industrial Park

  • The cost of managing and maintaining infrastructure in the industrial park is applied at a rate of USD 0.04/m² per month.
  • The wastewater treatment fee in the industrial park is USD 0.25/m³.

3. Geographical location of My Phuoc 3 Industrial Park

My Phuoc 3 Industrial Park is located within the Southern key economic quadrilateral, encompassing Ho Chi Minh City, Binh Duong, Dong Nai, and Ba Ria – Vung Tau. The project is situated adjacent to National Highway 13 – a vital transportation artery that has been expanded to six lanes, conveniently connecting Binh Duong with neighboring economic regions.

Connection range:

  • Distance from Ho Chi Minh City center: approximately 45 km
  • Distance from Thu Dau Mot City: approximately 14 km to the north
  • Distance from Tan Cang Port: approximately 32 km
  • Distance from Saigon Port Cluster, VICT, and Phuoc Long ICD: approximately 42 km
  • Distance from Tan Son Nhat International Airport: approximately 42 km

4. Infrastructure System

My Phuoc 3 Industrial Park is planned and built with a synchronous and modern technical infrastructure system, fully meeting the production and business needs of enterprises:

Internal roads within My Phuoc 3 Industrial Park

  • Internal Transportation:
    The internal road system has a width of 25m (15m wide asphalt road, 5m wide sidewalks on each side), capable of handling heavy loads of 40–60 tons/vehicle, facilitating goods transportation.
  • Electricity Supply System:
    Electricity is supplied from the national power grid via two 22kV lines, Tan Dinh – My Phuoc and Ben Cat – My Phuoc, directly connected to each plot of land. The transformer substation capacity reaches 126 MVA (phase 1), 200 MVA (phase 2), and is expected to reach 500 MVA (phase 3).
  • Clean Water Supply System:
    Water is treated according to international standards, with capacities of 12,000 m³/day (Phase 1), 30,000 m³/day (Phase 2), and 120,000 m³/day (Phase 3), ensuring a stable supply to each factory.
  • Wastewater Treatment System:
    The centralized wastewater treatment plant has a capacity of 16,000 m³/day, treating water from Class B to Class A standards before discharging it into the environment, fully complying with current regulations.
  • Fire Protection System:
    The industrial park has a professional fire fighting force, along with a system of hydrants located along the roads. A 24/7 security team is trained in fire prevention and security.
  • Telecommunications System:
    Telecommunications infrastructure is pre-installed on each plot of land, providing full telephone services, high-speed fiber optic internet, ADSL, and private transmission channels as needed.
  • Support Amenities:
    A labor support center located within the industrial park assists businesses with recruitment, labor policy consulting, and human resource networking.
  • Service Infrastructure:
    A diverse ecosystem of amenities including banks, hospitals, parks, supermarkets (GS, Metro), and entertainment and recreation areas contributes to improving the quality of work and life for workers and professionals.