CHA LA INDUSTRIAL PARK
Province
Tay Ninh
Occupancy Rate
98%
Area
42.19 hectares
Lease Price
Contact
Details
Industrial Park Name | Cha La Industrial Park |
Location | Binh Linh Hamlet, Cha La Commune, Duong Minh Chau District, Tay Ninh Province |
Total Area | 42,19 hectares |
Occupancy Rate | 98% |
Infrastructure Information
Electrical System | The current power supply to the Chà Là Industrial Park is a 22KV medium-voltage line from the 110/15-22kV Gò Dầu substation, connecting to the 110kV Hoà Thành substation, meeting the production and business needs of investors. |
Water System | With a wastewater treatment plant having a capacity of 2,500 m3/day (comprising 2 modules: 1 module with a capacity of 500 m3/day and 1 module with a capacity of 2,000 m3/day), wastewater will be collected from factories in the industrial park. Wastewater from these factories will be treated to meet Class B standards (according to national standards) before being discharged into the centralized wastewater treatment plant of the Chà Là Industrial Park. |
Sewage System | 500 m3/day |
Traffic System | The main road has a width of 25m, while the roads within the Chà Là Industrial Zone have a road surface width of 12m, with 7m sidewalks on each side. The road surface is paved with hot asphalt concrete meeting standards. |
1. Project Overview and Legal Information
The Chà Là Industrial Park originated as the Chà Là Industrial Cluster, planned to attract high-tech and engineering industries with an initial projected scale of 200 hectares. Phase 1, covering approximately 42 hectares, had a total investment of around 160 billion VND.
Specifically, the Chà Là Industrial Park project received an investment certificate from the Tay Ninh Economic Zone Management Board on April 18, 2008, with an infrastructure development area of 42.19 hectares. On June 16, 2010, the Provincial People’s Committee officially issued a decision establishing the industrial park with the same area. Phase 1 has been fully implemented on 42 hectares.
For the remaining area of approximately 158 hectares, part of Phase 2, implementation faces many obstacles due to the area being surrounded by irrigation canals and the lack of convenient transportation infrastructure. Furthermore, the land plot has an elongated, narrow shape, making it difficult to invest in integrated infrastructure and construct large-scale factories, resulting in low investment attraction. Therefore, on September 29, 2017, the People’s Committee of Tay Ninh province issued Official Letter No. 4554/VP-TH agreeing to halt the expansion of phase 2 of the industrial park.
Subsequently, on October 4, 2017, the People’s Committee of the province approved Decision No. 2301/QD-UBND on adjusting the detailed planning at a scale of 1/500 for phase 1. According to this adjustment, the total scale of phase 1 was increased to 55 hectares, of which industrial land accounts for 42.19 hectares and the remaining 12.8 hectares are allocated for residential areas.
On January 12, 2021, the Prime Minister approved the adjustment of the planning, reducing the total area of the industrial park from 200 hectares to 42.19 hectares according to Official Letter No. 27/TTg-CN.
Overview of Cha La Industrial Park:
- Name: Cha La Industrial Park
- Location: Binh Linh Hamlet, Cha La Commune, Duong Minh Chau District, Tay Ninh Province
- Scale: 42.19 hectares
- Operating period: 50 years (2008 – 2058)
- Occupancy rate: 98%
- Investment sectors: Diverse industries, prioritizing clean, environmentally friendly industries that do not generate hazardous waste.
2. Investment costs and incentives
Infrastructure maintenance fee: US$0.03/m²/year
- Electricity price:
- Peak hours: VND 3,322/kWh
- Normal hours: VND 1,819.8/kWh
- Off-peak hours: VND 1,188/kWh
- Clean water price: VND 9,200/m³ (including 5% VAT)
- Wastewater treatment fee: VND 8,500/m³ (excluding VAT)
- General incentives: Businesses are exempt from corporate income tax for the first two years, then receive a 50% reduction in tax payable for the following four years (applying a tax rate of 20%).
- Incentives for high-tech and supporting industries: A preferential tax rate of 10% is applied for 15 years; tax exemption for the first four years and a 50% reduction for the following nine years.
- Import tax incentives: Exemption from import tax on goods imported to create fixed assets for the project, including: machinery and equipment; specialized transport vehicles used in the technological process and vehicles for transporting workers; various types of components, parts, spare parts, molds and accompanying accessories; raw materials for manufacturing machinery, equipment or related parts; and construction materials that are not produced domestically.
3. Geographical location of Cha La Industrial Park
The Chà Là Industrial Park is located in Dương Minh Châu district – an area with ample land and flat terrain, highly favorable for the construction and development of large-scale industrial parks.
- The industrial park’s location is highly valued for its flexible connectivity to many key areas:
- Approximately 11 km southeast of the center of Tây Ninh province
- Approximately 85 km northeast of Ho Chi Minh City
- Approximately 83 km from Tan Son Nhat Airport
- Approximately 87 km from Saigon Port
- Approximately 34 km from Moc Bai International Border Gate
- Approximately 40 km from Xa Mat International Border Gate
- Approximately 17 km from Dau Tieng Lake
Notably, the southwestern area of the Chà Là Industrial Park borders the DT784 road – a crucial transportation artery directly connecting to Hoa Thanh town and Tay Ninh city, creating convenient links between areas within and outside the province. With the advantage of being a key economic hub, the industrial park has the potential for close connectivity with Ho Chi Minh City and the Southern key economic region.
Thanks to the increasingly complete and synchronized transportation system and upgraded technical infrastructure, businesses here can easily transport goods, optimize logistics costs, and improve the efficiency of their production and business operations.
4. Infrastructure system of Cha La Industrial Park
The Chà Là Industrial Park has been invested in with modern and comprehensive technical infrastructure, thereby creating a strong attraction for businesses to come and produce, and quickly achieving a high occupancy rate.
Internal roads within the Cha La Industrial Park
The specific infrastructure system is as follows:
- Internal transportation: The main arterial road has a width of 25m; internal roads have a road surface width of 12m, with sidewalks on both sides, each 7m wide. All road surfaces are paved with hot asphalt concrete, ensuring technical standards and facilitating goods transportation.
- Electricity system: Power is supplied from a 22kV medium-voltage line, connecting from the 110/15-22kV Go Dau substation to the 110kV Hoa Thanh substation, ensuring stable production and business needs for enterprises within the industrial park.
- Water supply and wastewater treatment system: The industrial park is equipped with a wastewater treatment plant with a total capacity of 2,500 m³/day, consisting of 2 modules (500 m³/day and 2,000 m³/day). Wastewater from factories is treated to meet Class B standards according to national regulations before being discharged into the centralized treatment system. Currently, the wastewater treatment capacity is approximately 500 m³/day.
- Telecommunications system: The communication infrastructure is connected to the Duong Minh Chau Telecommunications network, providing full services such as telephone, fax, and high-speed internet, effectively supporting business operations.
- Other amenities: The industrial park is secured and safe with a 24/7 Fire and Rescue Police force, the Cha La Commune Police operating within the premises, and a fully equipped medical station ready to meet healthcare needs.