TAN HUONG INDUSTRIAL PARK

Province

Tien Giang

Occupancy Rate

100%

Area

79 hectares

Lease Price

80 USD/m2

The Tan Huong Industrial Park was established by the Prime Minister’s Decision No. 1517/QD-TTg dated September 26, 2006. Subsequently, the Management Board of Industrial Parks of Tien Giang Province issued Investment Registration Certificate No. 5321100001 on November 20, 2006. On January 2, 2008, the People’s Committee of Tien Giang Province approved the detailed construction plan at a scale of 1/2000 in Decision No. 01/QD-UBND. This plan was further adjusted through several stages (2010, 2011, 2012, 2014…) and finalized in Decision No. 472/QD-UBND dated February 26, 2020.

Planning map of Tan Huong Industrial Park

Details

Industrial Park Name

Tan Huong Industrial Park

Location

Tan Huong Commune, Chau Thanh District, Tien Giang Province

Total Area

197,33 ha

Land Rental Price

100 USD/m2

Construction Density

60%

 Occupancy Rate

100%

Infrastructure Information

Electrical System

The power is supplied from the 22KV national grid line, with a capacity of up to 40MVA.

Water System

15,000 m3/day

Sewage System

10,000 m3/day

Traffic System

The road in the infrastructure is 16 meters wide with 4 lanes.

1. Project Overview and Legal Information

With a total investment of approximately VND 581.6 billion, Tan Huong Industrial Park covers an area of ​​197.33 hectares and is being developed in two phases:

  • Phase 1: 138 hectares
  • Phase 2: 59.33 hectares

The area of ​​industrial land available for lease is 147.72 hectares (74.86%), green space is 20.54 hectares (10.41%), and transportation land accounts for 11.58%.

Basic Information:

  • Project Name: Tan Huong Industrial Park
  • Investor: Nhut Thanh Tan Co., Ltd.
  • Location: Tan Huong Commune, Chau Thanh District, Tien Giang Province
  • Scale: 197.33 hectares
  • Operating Period: 50 years (2006 – 2056)
  • Occupancy Rate: 100%

Investment Attractions:
The industrial park focuses on multi-sector development, including: electrical and electronics, information technology, office equipment; mechanical engineering serving agriculture, construction and transportation; chemical production, fertilizers, pharmaceuticals; textiles, footwear, plastics, packaging; processing of agricultural and forestry products, food; and ceramics, glass and handicrafts.

Overview of Tan Huong Industrial Park

The development of Tan Huong Industrial Park has contributed to boosting export growth in Tien Giang province, creating jobs for tens of thousands of local workers, and supporting the economic restructuring of Chau Thanh district towards industrialization and modernization, coupled with social welfare.

2. Investment costs and incentives

  • Management fee: US$0.4/m²/year
  • Electricity price:
    • Peak hours: US$0.1/kWh
    • Normal hours: US$0.05/kWh
    • Off-peak hours: US$0.03/kWh
  • Wastewater treatment fee: US$0.28/m³ (meeting Class A standards according to QCVN 40:2011/BTNMT)

As part of the industrial park system of Tien Giang province, businesses investing in Tan Huong Industrial Park enjoy preferential policies on corporate income tax, land rent, and support from the local government.

Although the land is already fully occupied, the market for transferring land lease rights and renting factory space in the industrial park remains very active, suitable for businesses that need to expand production quickly without waiting for new construction.

3. Geographical location

Tan Huong Industrial Park is located at the gateway to Tien Giang province, right next to National Highway 1 and near the Ho Chi Minh City – Trung Luong Expressway, creating a significant advantage in transportation connectivity.

The project is situated in the center of a large consumer market, and is also conveniently located for transporting goods to river and seaports in My Tho and Ho Chi Minh City for export purposes.

This is one of the key industrial parks in the Mekong Delta region, attracting many FDI and DDI enterprises operating in sectors such as food, textiles, plastics, packaging, and animal feed.

Connection range:

  • Distance to Ho Chi Minh City: approximately 37 km (via Ho Chi Minh City – Trung Luong Expressway)
  • Distance to My Tho City: approximately 12 km
  • Distance to Hiep Phuoc Port: approximately 45 km
  • Distance to Tan Son Nhat International Airport: approximately 43 km

=> This location helps businesses optimize logistics costs when transporting goods to major economic centers and key port and airport systems.

4. Infrastructure System

Tan Huong Industrial Park boasts a comprehensively developed infrastructure, effectively meeting production needs:

  • Internal transportation: 16m wide roads, 3m wide green median strips, 15m wide green sidewalks on both sides, designed with 4 lanes.
  • Electricity system: Supplied from the national grid at 22kV, with a capacity of approximately 40 MVA.
  • Water supply: Capacity of 15,000 m³/day.
  • Wastewater treatment: Centralized system with a capacity of 10,000 m³/day, meeting environmental standards.
  • Fire protection: Fire hydrants are strategically placed along the roads, spaced 150m apart.
    Amenities: Social housing area covering over 6 hectares, accommodating approximately 11,500 workers.

5. The business is currently operating.

Currently, Tan Huong Industrial Park is 100% occupied with over 20 domestic and foreign projects, creating jobs for nearly 50,000 workers. Many large enterprises operate in fields such as textiles, footwear, plastic packaging, animal feed, mechanics, and automotive parts…

The presence of large-scale FDI enterprises shows that Tan Huong Industrial Park is particularly suitable for light industries that employ a large workforce, taking advantage of abundant agricultural raw materials and the large consumer market in Ho Chi Minh City.