SONG MAY INDUSTRIAL PARK

Province

Dong Nai

Occupancy Rate

80%

Area

473.95 hectares

Lease Price

50 USD/m2

The Song May Industrial Park was established and its investment approved by Decision No. 269/QD-TTg dated April 7, 1998, of the Prime Minister. Subsequently, the project was further adjusted and the detailed planning at a scale of 1/2000 for phase 1 was finalized, and the detailed construction plan at a scale of 1/2000 for phase 2 was approved by Decision No. 557/QD-UBND dated February 15, 2008, of the People’s Committee of Dong Nai province.

Song May Industrial Park viewed from above.

Details

Industrial Park Name

Song May Industrial Park

Location

Bac Son commune, Ho Nai commune, Trang Bom district; Tan An commune, Vinh Cuu district, Dong Nai province

Total Area

473,95 hectares

Land Rental Price

50 USD/m2

 Occupancy Rate

80%

Infrastructure Information

Electrical System

61.281 KVA

Water System

10,000 m3/day

Sewage System

4,000 m3/day

Traffic System

Internal roads are 15-22m wide and have 4 lanes.

1. Project overview and legal information

Song May Industrial Park is one of the key industrial development projects of Dong Nai province, and also one of the oldest industrial parks in the region. The project covers a total area of ​​473.95 hectares and is being implemented in two phases:

  • Phase 1: 250.21 hectares
  • Phase 2: 223.74 hectares

Overview of Song May Industrial Park:

  • Project Name: Song May Industrial Park
  • Location: Spanning across Bac Son commune, Ho Nai commune (Trang Bom district) and Tan An commune (Vinh Cuu district), Dong Nai province
  • Scale: 473.95 hectares
  • Operating Period: 50 years (from 1999 to 2049)
  • Occupancy Rate: Approximately 80%

The industrial park is oriented towards attracting diverse manufacturing industries, including: food processing; Manufacturing and assembling electrical and electronic equipment and components; manufacturing sports equipment, household goods and children’s toys; textiles, footwear and leather goods; mechanical and precision engineering; packaging production; building materials; wood processing and wood products…

With its large scale, diverse industries and favorable location, Song May Industrial Park offers many opportunities for investment and sustainable development for businesses.

2. Investment costs in Song May Industrial Park

The following infrastructure and service fees apply to industrial park usage:

  • Infrastructure management fee: 0.3 USD/m²/year (subject to adjustment according to government regulations)
  • Clean water price: 7,200 VND/m³
  • Electricity price: ranging from 900 – 1,100 VND/kWh
  • Wastewater treatment fee: 0.32 USD/m³

3. Geographical location of Song May Industrial Park

Connectivity from Song May Industrial Park to other projects in the area.

The Song May Industrial Park boasts a strategic location on Route 767, in Bac Son commune, Trang Bom district – a gateway connecting northern districts with the central areas of Bien Hoa City and Ho Chi Minh City. The project is situated near National Highway 1A and the Tri An intersection, facilitating connections with many large industrial parks in Dong Nai such as Ho Nai, Bau Xeo, Amata, and Giang Dien…

Distance from the center of Bien Hoa City:

  • Approximately 15 km from the center of Bien Hoa City
  • Approximately 45 km from the center of Ho Chi Minh City
  • Approximately 16 km from Bien Hoa train station and airport
  • Approximately 55 km from Tan Son Nhat International Airport
  • Approximately 34 km from Long Thanh International Airport
  • Approximately 18 km from Dong Nai Port

Construction planning at a scale of 1/2000 for Song May Industrial Park.

4. Infrastructure System

As of 2022, both phases of the Song May Industrial Park have not yet completed infrastructure investment and are in the process of accelerating land clearance. The detailed plan of the project is oriented as follows:

  • Internal transportation: The main road has a width of 22-35m, with 2-4 lanes; internal roads are 15-22m wide, designed with 4 lanes, accommodating loads up to 30 tons.
  • Electricity system: Uses electricity from the national grid 110/22KV with a total capacity of approximately 61,281 KVA.
  • Water supply: Clean water supply system with a maximum capacity of 10,000 m³/day.
  • Wastewater treatment: A wastewater treatment plant with a capacity of 4,000 m³/day, meeting the needs of operating businesses and part of the needs of phase 2.
  • Service infrastructure: Fully equipped housing for workers, accommodation for experts and management staff, serving long-term living and working needs.

5. List of Companies Operating in Song May Industrial Park

Businesses operating in Song May Industrial Park

As of 2022, Song May Industrial Park had attracted 75 licensed investment enterprises. Of these, 67 were operational, 3 had temporarily ceased operations, and 5 had not yet commenced production.

Some notable enterprises operating in Song May Industrial Park include: Dona Victor Molds Co., Ltd., Dona Victor Footwear Co., Ltd., Junmay Co., Ltd., Dona Botron Co., Ltd., and Ngoc Sinh Household Appliances Joint Stock Company…

The presence of these enterprises contributes to a stable production environment and promotes the overall development of the industrial park.