GO DAU INDUSTRIAL PARK
Province
Dong Nai
Occupancy Rate
100%
Area
210 hectares
Lease Price
160 USD/m2
The Go Dau Industrial Park was established by Decision No. 662/TTg dated October 18, 1995, of the Prime Minister, with an initial scale of 330 hectares (excluding the area of Vedan Vietnam Industrial Company located outside the industrial park boundary).
Subsequently, the People’s Committee of Dong Nai province made a partial adjustment to the detailed construction planning at a scale of 1/2,000 in Phuoc Thai commune, Long Thanh district. According to the adjusted plan, the industrial park area was changed from 210 hectares to 182.3761 hectares.
Details
Industrial Park Name | Go Dau Industrial Park |
Location | Phuoc Thai Commune, Long Thanh District, Dong Nai Province |
Total Area | 210 hectares |
Land Rental Price | 160 USD/m2 |
Construction Density | 60% |
Occupancy Rate | 100% |
Infrastructure Information
Electrical System | 40 MVA substation. |
Water System | 10,000 m3/day |
Sewage System | 500 m3/day |
1. Project overview and legal information
Go Dau Industrial Park is the only industrial park with a comprehensively invested in internal port system capable of receiving ships with a tonnage of up to 30,000 DWT. This gives the industrial park a significant advantage in waterborne cargo transportation, and its proximity to natural gas sources from the Ba Ria – Vung Tau region creates favorable conditions for energy-intensive industries.
Overview of Go Dau Industrial Park:
- Name: Go Dau Industrial Park
- Location: Phuoc Thai Commune, Long Thanh District, Dong Nai Province
- Area: 182.4 hectares
- Operating period: 50 years (1995 – 2045)
- Occupancy rate: 100%
Investment sectors targeted:
The industrial park aims to attract diverse sectors such as plastics and polymers manufacturing; mechanical engineering and metal components; glass, ceramics, and building materials manufacturing; fertilizers and chemicals; Processing of liquefied petroleum gas and asphalt; chemical industries (detergents, cleaning agents, cosmetics, synthetic resins); food processing (seafood, grains, beverages, canned fruits and vegetables)… along with other industries such as electronics, medical instruments, sporting goods and textiles (excluding dyeing).
The Go Dau Industrial Park has effectively fulfilled its initial planning objectives, becoming a promising industrial zone along the National Highway 51 corridor, focusing on the chemical and energy industries. Since its operation began, the industrial park has quickly attracted many large corporations such as Shell, Total Gas, Samsung Chemical, LG Chemical, etc., contributing to the industrial development of the region.
2. Costs and investment incentives for Go Dau Industrial Park
Current water prices: Applied according to the price list published by the water supply unit (details can be found at dowaco.vn).
Electricity prices: Implemented according to Decision No. 4495/QD-BCT dated November 30, 2017 of the Ministry of Industry and Trade on the current electricity selling price schedule.
Wastewater treatment fee (excluding VAT): 7,282 VND/m³ (approximately 0.32 USD/m³).
Businesses operating in the Go Dau Industrial Park are subject to investment incentives, including a two-year exemption from corporate income tax (CIT) and a 50% reduction in tax payable for the following four years, as stipulated in Decree 218/2013/ND-CP.
3. Geographical location of Go Dau Industrial Park
Located in the Southern key economic region, Go Dau Industrial Park is situated on National Highway 51 – a crucial transportation artery connecting Dong Nai with Ba Ria – Vung Tau, thus possessing significant advantages in regional connectivity and goods transportation.
Distance to key areas:
- Approximately 67 km from Ho Chi Minh City
- Approximately 42 km from Bien Hoa City
- Approximately 11 km from Go Dau Port
- Approximately 15 km from Cai Mep Port
- Approximately 39 km from Cat Lai Port
- Approximately 60 km from Tan Son Nhat International Airport
- Approximately 12 km from Long Thanh International Airport
4. Infrastructure System
The Go Dau Industrial Park boasts comprehensively developed technical infrastructure, creating a favorable environment for businesses to carry out production activities. Despite being established in 1995, the industrial park maintains its attractiveness thanks to its increasingly complete infrastructure system.
- Internal transportation: The internal road system is fully equipped with signs, speed bumps, warning lights, road markings, and lighting. The road surface is paved with asphalt concrete, capable of handling H30 loads, ensuring fast and convenient traffic flow and goods transportation.
- Electricity system: Electricity is supplied from the national grid through a 40 MVA transformer station, ensuring stable production needs.
- Water supply system: Water is supplied by Phu My Water Supply Company and Ho Cau Moi Water Supply Company, with a total capacity of approximately 10,000 m³/day.
- Wastewater Treatment System: The wastewater treatment plant has a capacity of 500 m³/day, applying a combination of biological and physicochemical technologies. The treated water meets the standards of QCVN 40:2011/BTNMT (column A) before being discharged into the environment.
- Communication System: The telecommunications infrastructure is fully developed, supporting services such as telephone, fax, and high-speed internet (ADSL). An automated telephone exchange with 960 numbers and international connectivity via a 40-channel VIBA network ensures uninterrupted communication for the enterprise.