AN PHUOC INDUSTRIAL PARK

Province

Dong Nai

Occupancy Rate

100%

Area

201 hectares

Lease Price

160 USD/m2

Details

Industrial Park Name

An Phuoc Industrial Park

Location

An Phuoc Commune, Long Thanh District, Dong Nai Province

Total Area

201 hectares

Land Rental Price

160 USD/m2

Construction Density

60%

 Occupancy Rate

100%

Infrastructure Information

Electrical System

22KV

Water system

10,000 m3/day and night

Sewage System

6,000 m3/day

Traffic System

The internal roads are paved with hot-mix asphalt and designed according to Vietnamese standards, with a load capacity of H30, and a width ranging from 20m to 40m, meeting the needs of transporting large-capacity container trucks.

1. Project overview and legal information

Dong Nai is considered one of Vietnam’s provinces with great development potential, serving as a gateway connecting to Ho Chi Minh City and constantly striving for breakthroughs thanks to its increasingly comprehensively invested and upgraded urban infrastructure.

It is also an attractive destination for domestic and foreign investors. According to the Industrial Park Management Board, in 2018 alone, the leased land area in industrial parks in the province reached approximately 150 hectares, exceeding the set plan by 50%. Some industrial parks with high lease rates include Nhon Trach 6 (Nhon Trach district), Dau Giay (Thong Nhat district), Giang Dien (Trang Bom district), Long Khanh (Long Khanh town), Long Duc and Loc An – Binh Son (Long Thanh district). The surge in demand for land has led to price adjustments in many industrial parks, increasing by 4-10 USD/m² for lease terms of approximately 40 years since mid-2018.

According to economic experts, Dong Nai will continue to attract significant investment capital in the coming period. In particular, with the completion and operation of Long Thanh International Airport and key expressways, the province will become an important transportation hub in the South. This opens up great opportunities for businesses in many sectors. Currently, there are still approximately 1,613 hectares of unleased industrial land in the province.

In this context, An Phuoc Industrial Park in Dong Nai is considered a potential destination, attracting the attention of many foreign investors, especially in supporting industries and environmentally friendly manufacturing.

Priority sectors for investment attraction include:

  • Textile dyeing, garment manufacturing, footwear
  • Manufacture of household goods from wood, plastic, aluminum, iron, and enamel
  • Mechanical engineering
  • Electrical and electronics
  • Manufacture of building materials

2. Costs

3. Geographical location of An Phuoc Industrial Park - Dong Nai

An Phuoc Industrial Park – Dong Nai is located in An Phuoc commune, Long Thanh district, Dong Nai province, situated in a key transportation hub of the Southern key economic region. Thanks to this strategic location, connectivity and trade with neighboring areas are quick and convenient.

The distance from the industrial park to key locations is as follows:

  • Approximately 47 km from the center of Ho Chi Minh City (approximately 60 minutes by car)
  • Approximately 30 km from Ho Chi Minh City High-Tech Park (45 minutes)
  • Approximately 20 km from the center of Bien Hoa City (40 minutes)
  • Approximately 45 km from Thi Vai – Cai Mep port cluster (60 minutes)
  • Approximately 35 km from Cat Lai port (45 minutes)
  • Approximately 45 km from Tan Son Nhat airport (60 minutes)
  • Approximately 18 km from Long Thanh International Airport (20 minutes)

4. Infrastructure System

An Phuoc Industrial Park in Dong Nai boasts modern and integrated infrastructure, ready to meet the needs of investment projects. Essential systems such as electricity, water, transportation, and telecommunications are fully developed, ensuring efficient support for production and business activities.

Internal transportation system:
Internal roads are paved with hot-mix asphalt, designed according to Vietnamese standards with a load capacity of H30. The road surface width ranges from 20m to 40m, suitable for container trucks and other heavy-duty vehicles. The entire industrial park is seamlessly connected by an internal transportation network, facilitating convenient movement and goods transportation.

Electricity Supply System:
Electricity is supplied from the national grid with a voltage of 22KV, categorized by usage hours:

  • Normal hours: 1,555 VND/kWh
  • Off-peak hours: 1,007 VND/kWh
  • Peak hours: 2,871 VND/kWh
    (Prices may be adjusted according to government regulations.)

Water Supply System:
Clean water is supplied stably by Dong Nai Water Supply Company Limited with a capacity of approximately 10,000 m³/day, fully meeting production and living needs.

Telecommunications System:
A diverse telecommunications infrastructure with the participation of providers such as VNPT, FPT, Viettel… ensures seamless connectivity. Internet speed:

  • ADSL: up to 8 MB/s
  • Fiber optic: up to 90 MB/s

Wastewater treatment system:
The centralized wastewater treatment plant has a total capacity of 6,000 m³/day (Phase 1 reaches 2,000 m³/day). Treated wastewater meets QCVN 40:2011/BTNMT standards (column A) before being discharged into the environment.
Wastewater treatment costs are approximately US$0.32/m³ (excluding tax), with the amount of wastewater calculated to be equivalent to 80% of the amount of clean water consumed.