1. Project overview and legal information
Below is an overview of the Nam Dong Ha Industrial Park:
- Name: Nam Dong Ha Industrial Park – Quang Tri
- Location: Dong Luong Ward, City. Dong Ha, Quang Tri Province
- Scale: 99 hectares
- Rental price: Approximately US$60/m² (excluding VAT and subject to change)
- Investment sectors: Wood processing, fertilizer production, seafood processing, electricity and solar energy production, beverages (wine, beer, soft drinks), garment manufacturing
Human resources:
- The province’s population density is approximately 126.7 people/km²
- The population structure is fairly balanced, with women accounting for 50.4% and men 49.6%.
- The population aged 0-59 accounts for approximately 90.9%, with those under 15 years old accounting for 37.9%, indicating a young and abundant workforce.
- The abundant workforce with competitive labor costs is suitable for manufacturing and processing businesses.
2. Costs and incentives for land lease in Nam Dong Ha Industrial Park
Costs and Service Prices:
- Land lease price: Ranging from 30–35 USD/m² for a 50-year term (excluding VAT)
- Infrastructure management and maintenance fee: 0.25 USD/m²/year (excluding VAT)
- Electricity price: Applied according to the price list of Quang Nam Provincial Electricity Company at the time of use
- Water price: Calculated according to the unit price of the water supply unit at the time of use
- Telecommunications and other service costs: Calculated according to the regulations of the respective provider at the time of use
3. Geographical location
The Nam Dong Ha Industrial Park boasts a favorable geographical location, facilitating quick connections to neighboring areas and major economic centers. Specifically:
- It is only about 3 km from the center of Dong Ha City.
- It is approximately 160 km from Da Nang City.
- It is 168 km from Da Nang Airport.
- It is approximately 168 km from Tien Sa Seaport (Da Nang).
4. Infrastructure system
Basic Infrastructure:
- Internal Transportation:
The main road is 25m wide, and branch roads are approximately 15m wide, ensuring smooth traffic flow throughout the area. - Electricity System:
Electricity is supplied from the 110/22kV grid, providing stable power for production needs. - Wastewater Treatment System:
Operated according to factory standards, ensuring stable treatment capacity. - Water Supply System:
Water is supplied from the water treatment plant with a capacity of approximately 16,000 m³/day, fully meeting usage needs.